
Once we have the final AutoCad drawings and all the style specifications have been approved, our in-house state licensed engineer reviews the drawings to make sure they meet or exceed all current building code specifications. He reviews the wind load tolerances and verifies they can withstand South Florida’s hurricane standards. He then approves and stamps the drawings and they are ready for permitting.
Date Published:2/6/2011